Prepare a model-failover run sheet covering unavailable providers, denied fallbacks, partial streams, and member removal.
Juan Mora

A fallback connection returns a successful response during setup. That establishes connectivity. It does not show what happens when the primary fails halfway through a stream or when the only healthy fallback is forbidden.

Suppose the application needs a complete classification result. A fallback that returns half a response hasn't recovered that service. Test those failure cases before the real outage, and keep the results in a run sheet the on-call team can use.

What counts as a recovered request?

Use the pool contract to name the input, required output, approved members, and acceptable failure behavior. Use the failover decision table for the conditions under which another attempt is appropriate.

For a hypothetical classification service, recovery means the client receives a complete result satisfying its schema within its agreed deadline. A healthy provider response with a missing classification field is not service recovery.

Choose an isolated rehearsal environment, synthetic data, a cost allowance, and a stop condition. Do not inject failures into a shared production route as an improvised test.

Prepare a run sheet

Record the client version and retry configuration, gateway and pool, member list, strategy, failover limit, applicable rules and quotas, and the application deadline.

Then run one changed condition at a time. The following is a proposed protocol; its observations remain to be collected.

RehearsalChange introducedObserve at the clientEvidence to retain
BaselineNo induced failureComplete valid outputRequested pool and served connection
Primary unavailableControlled failure before a usable responseApproved fallback or defined terminal failureAttempt sequence and final upstream
Forbidden fallbackCandidate is reachable but policy-refusedNo dispatch to that candidateRefusal and any later permitted route
Early stream failureFailure before the first response byteEligible recovery within the budgetTime and source of first delivered output
Late stream failureFailure after output beginsExplicit partial-response failureDelivered prefix, terminal error, application handling
Member removalRemove the selected test member from the poolNew requests stop choosing it after configuration is appliedObserved routes and configuration-change time
Return to serviceRestore the approved member configurationIntended distribution resumesServed connections and application-valid outputs

Change one thing per run. If you remove a member, change a rule, and upgrade the client together, you won't know which change caused the result.

Does the fallback return something the application can use?

Run representative application cases against every fallback. If the client depends on provider-specific options, test the actual request shape through the intended route.

Dome's LLM Gateway documentation distinguishes same-dialect forwarding from cross-dialect rebuilding, where provider-specific extensions can be lost. A successful translated request does not establish that the option the application needed survived.

Keep output validation in the run sheet. Routing success and application acceptance should be separate recorded observations.

Practice removing a member

The current pool documentation says the stored member enabled field is ignored during dispatch. It directs operators to remove a member to stop routing to that connection through the pool.

Use the documented effective operation in the rehearsal and verify new requests. Removing a connection from one pool does not disable it everywhere else. Account for other pools and direct routes when the incident objective is broader.

Do not mistake a saved configuration for the observed end of traffic. Record when the change is made and what subsequent requests actually do.

Count retries in the client as well as the pool

The pool failover limit bounds additional member attempts. It does not, by itself, describe the application's complete retry policy or service deadline.

Inspect the SDK's retry behavior alongside the pool configuration. The application may initiate a new request after the broker has already exhausted its candidate set. Set a limit for those client retries too, then count the total attempts during the test.

For streaming, stop interpreting recovery as transparent once content has reached the caller. The application must know what to do with an incomplete response.

Keep failures and unanswered questions in the report

For every row, record expected behavior, actual behavior, application-valid result, served destination, errors, and unresolved questions. Retain failed and inconclusive runs.

Promote the configuration only after it meets the application's stated requirements. The run sheet should also become the incident procedure: which member to remove, what a partial failure looks like, and which evidence confirms that service has recovered.

More from the blog.

Before you deploytell users what will change
Export quota
Requests1
Records25,000
Quota unitRecords
Agents, governedfrom the Dome team

Next perspective,straight to your inbox.

Subscribe

Each new perspective and field guide, the week it publishes. Nothing else.

Product updates

Release notes and platform changes live on the updates page.

Every agent you run,under one system of control.